Modular Construction: key to success
Our experience in the New York Construction industry has provided us with insight
into the pitfalls of conventional construction, including poor project management,
missed schedules and deadlines, cost overruns, poor field coordination and general
inability to satisfactorily service the client. This experience led us to the
conclusion that a better method had to be found.
Modular Construction Facts
- allows us to build to client specification in a controlled environment
- we are not subject to schedule constraints by weather, building access for
tradesman or possible contamination of the building materials by exposure to the
elements
- our workmen can proceed comfortably around the clock if schedule requires
- vastly reduced amount of time that existing tenants would be inconvenienced
by street obstructions and noise
- depending on the size of the project, we can install the finished space in
anywhere from one day to a week
- the client has complete control over the process, including design, timing
and method of construction
- flexible options and a realistic budget and schedule
Our team of experts can put together the complete design build package for
presentation to a client including feasibility studies, geotech survey, architectural
drawings, engineering, cost and schedule analysis.